« SAPPHIRE Now - huge surprise, good stuff and a couple of important issues | Main | Simple errors and big consequences, same procedure as always. »

Comments

phil jones
sig

Good point, and that's the thing about BRP, it's per se non-standard.

But as you say, there might be the occasional outside-of-the-flow flow-snippets, like "update project details" that should be allowed at any point: For that, we as an example' have a "flow starter" embedded in the report (list of projects) which says (Update this project object?) limited to the project owner of course.

That should not mess up the PUI + Reports (two tabs) as these kind of ad-hoc situations are predictable.

The comments to this entry are closed.

My Photo

Contact


  • Phone: +33 6 8887 9944
    Skype: sigurd.rinde
    iChat/AIM: sigrind52

Tweet this


Thingamy sites

  • Main site
  • Concept site

Tittin's blog


Hugh's


Enterprise Irregulars


Faves

Twitter Updates

    follow me on Twitter

    alltop


    • Alltop, all the cool kids (and me)

    Subscribe

    Blog powered by Typepad
    Member since 01/2005